Could I help you?
Sale! View larger

ISA-77.43.01:2014

New product

ISA-77.43.01:2014

Fossil Fuel Power Plant Unit/Plant Demand Development

More details

$31.68 tax incl.

-56%

$72.00 tax incl.

More info

The purpose of this document is to establish the minimum requirements for the functional design specifications of unit/plant demand development for control systems for fossil-fueled power plant boilers.
The scope of this standard is to address the unit/plant demand development subsystem for boilers with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes generation demand, boiler demand development, turbine demand development, throttle/header pressure control, and unit megawatt/steam flow control as applicable.
This standard will address two types of process applications:
a single boiler supplying a single turbine, typical of an electric utility power plant; and
a single boiler or multiple boilers supplying a common distribution header, typical of an industrial power plant.
Specifically excluded from consideration are:
dispatch control;
turbine/generator control (other than turbine demand);
feedwater controls
steam temperature controls (covered separately by ANSI/ISA-77.44.01, Fossil Fuel Power Plant – Steam Temperature Controls);
combustion controls (covered separately by ANSI/ISA-77.41.01, Fossil Fuel Power Plant Boiler Combustion Controls);
steam distribution control systems;
economic loading of boilers; and
fluidized bed boilers.

Author ISA
Editor ISA
Document type Standard
Format Paper
ICS 25.040.40 : Industrial process measurement and control
27.100 : Power stations in general
Number of pages 32
Replace ISA-77.43.01 (2002)
Cross references ANSI/ISA 77.43.01 (2014), IDT
Weight(kg.) 0.1544
Year 2014
Document history ISA-77.43.01 (2014)
Country USA
Keyword ISA 77;ISA-77;77;ANSI/ISA-77.43.01-2014